Question:
 Analyst use ----------to learn about feelings, opinions and general experiences or to explore
a process or problems.

1.open ended questionnaires

2.Close ended questionnaires

3.Record Inspection

4.Observation

Posted Date:-2022-07-12 04:35:00


Question:
 Decision makers who are concerned with tactical (short-term) operational problems and
decision making are

1.middle managers

2.executive managers

3.supervisors

4.mobile managers

Posted Date:-2022-07-12 03:44:31


Question:
 Effectiveness is a major goal of these types of systems.

1.Expert systems

2.Closed system

3.MIS

4.DSS

Posted Date:-2022-07-12 03:53:55


Question:
 In ----------- analyst examines information that has been recorded about system and about
the users.

1.Record Review

2.Interviews

3.Questionnaires

4.Observation

Posted Date:-2022-07-12 04:36:28


Question:
 Which is the first step in the software development life cycle ?

1.Analysis

2.Design

3.Problem/Opportunity Identification

4.Development and Documentation

Posted Date:-2022-07-12 03:43:54


Question:
 Which one of the following is not a step of requirement engineering?

1. elicitation

2.design

3.analysis

4.documentation

Posted Date:-2022-07-12 04:25:30


Question:
--- it include of study of cost of system.

1.Technical feasibility

2.Economic feasibility

3. Operational feasibility

4. None of above

Posted Date:-2022-07-12 04:30:08


Question:
---- are software systems delivered to customer with the documentation whichdescribes how to install and use the system.

1. Software Product

2.Output

3.Input

4.Processing

Posted Date:-2022-07-12 04:40:32


Question:
---- may be inefficient use of both respondent and interviewer time.

1.Unstructured Interviews.

2.Structured Interviews

3.Questionnaires

4. Record inspection or view

Posted Date:-2022-07-12 04:34:16


Question:
----- It depict constantly an ongoing constantly changing the system

1.Schematic Models

2.Flow system models

3.Static system models

4. Dynamic system models

Posted Date:-2022-07-12 03:50:25


Question:
----- it include the study like can the work for the project is done with current equipment existing software technology and with available manpower.

1.Technical feasibility

2.Economic feasibility

3.Operational feasibility

4.None of the above

Posted Date:-2022-07-12 04:29:24


Question:
----- These are stand-alone systems which are produced by a development organizationand sold on the open market to any customer who is able to buy them.

1.Generic Product

2.Customized product

3.Product

4.None of these

Posted Date:-2022-07-12 04:41:34


Question:
------ interviews use of standardized question in either an open response or close
response format.

1.Unstructured Interviews.

2.Structured Interviews

3.Questionnaires

4.Record inspection or view

Posted Date:-2022-07-12 04:33:06


Question:
------- it include system be used if it developed and implemented.

1.Technical feasibility

2.Economic feasibility

3.Operational feasibility

4.None of the above

Posted Date:-2022-07-12 04:30:46


Question:
------- refers to the process of examining a business situation with the intent of improving
it through better procedures and methods.

1.Software Anticipation

2.Software Investigation

3.Software Requirement

4.System analysis

Posted Date:-2022-07-12 04:26:55


Question:
------- refers to the process of examining a business situation with the intent of improving it
through better procedures and methods.

1. Software Anticipation

2.Software Investigation

3.Software Requirement

4.System analysis

Posted Date:-2022-07-12 03:42:30


Question:
------- This type of model exhibits are pair of relationship such as activity time or cost
quantity.

1.Schematic Models

2.Flow system models

3. Static system models

4.Dynamic system models

Posted Date:-2022-07-12 03:49:39


Question:
-------------system operates continuously to keep management abreast of what is
happening in all major areas

1.Execution Information system(EIS)

2.Integrated system

3.Subsystem

4.Transaction processing system

Posted Date:-2022-07-12 03:54:34


Question:
--------is represented by organization chart.

1.Formal Information system

2.Closed system

3.MIS

4.DIS

Posted Date:-2022-07-12 03:52:25


Question:
--------It shows the flow of material ,energy and information that hold system
together.

1.Schematic Models

2.Flow system models

3. Static system models

4.Dynamic system models

Posted Date:-2022-07-12 03:48:39


Question:
-------is a unit that is part of a larger system that means a larger system divided into
subparts the subpart is known as --------------

1.Execution Information system(EIS)

2.Integrated system

3.Subsystem

4.Transaction processing system

Posted Date:-2022-07-12 03:56:24


Question:
------is a first technical step in software process.

1.Software Anticipation

2.Software Investigation

3.Software Requirement

4.None of the above

Posted Date:-2022-07-12 04:26:21


Question:
------it shows a two dimensional depicting system elements and their linkages.

1.Schematic Models

2.Flow system models

3.Static system models

4. Dynamic system models

Posted Date:-2022-07-12 03:47:54


Question:
-----system collect,store,modify and retrieve the transaction of an organization.

1.Execution Information system(EIS)

2.Integrated system

3. Subsystem

4.Transaction processing system

Posted Date:-2022-07-12 03:57:19


Question:
-----system in one which automatically controls or modifies its own operation byresponding to data generated by the system itself.

1.Open System

2.Closed system

3.MIS

4.DIS

Posted Date:-2022-07-12 03:51:50


Question:
-----systems used organizational data as well as external data collected from
environment of the organization.

1.Formal Information system

2.Closed system

3.MIS

4.DSS

Posted Date:-2022-07-12 03:53:21


Question:
-----The system which are represented conceptually non Physical systems are called

1.Abstract system

2.System model

3.Open system

4.Closed system

Posted Date:-2022-07-12 03:47:12


Question:
----is concerned with how a systems tied together in order to achieve common
goal thus forming integration.

1. Interaction

2.Interdependence

3.Integration

4.Central Objective

Posted Date:-2022-07-12 04:23:40


Question:
----means that parts of the organization depend on one another

1. Interaction

2.Interdependence

3.Integration

4.Central Objective

Posted Date:-2022-07-12 04:24:33


Question:
---consists of individual computers may be workstations or multiple systems.

1.Execution Information system(EIS)

2.Integrated system

3.Subsystem

4.Transaction processing system

Posted Date:-2022-07-12 03:55:28


Question:
A ---------------is a set or group of component that interact to accomplish some
purpose.

1. System

2.Software

3.Subsystem

4.Physical system

Posted Date:-2022-07-12 03:37:54


Question:
An -----------system is a one which does not provide for its own control or modification.

1.Open System

2. Closed system

3.MIS

4.DIS

Posted Date:-2022-07-12 03:51:08


Question:
Analyst used ------- method to collect information from individual or from group.

1.Interviews

2.Questionnaires

3.Record inspection or view

4.Observations

Posted Date:-2022-07-12 04:31:30


Question:
Analyst used --------- method to collect information from person by asking standard
question to person or group of person.

1.Interviews

2.Questionnaires

3.Record inspection or view

4.Observations

Posted Date:-2022-07-12 04:32:19


Question:
Compilers, Editors software come under which type of software?

1.System software

2.Application software

3.Scientific software

4.None of the above

Posted Date:-2022-07-12 03:41:49


Question:
Critical information for top management is provided by ....... information system.

1.expert

2.managerial

3.executive

4.decision

Posted Date:-2022-07-12 03:45:49


Question:
Elements of system.

1.Output/Input

2.Control

3.Feedback

4.All of the above

Posted Date:-2022-07-12 03:39:20


Question:
Software is defined as ____

1. Instructions

2.Data Structures

3.Documents

4.All of the above

Posted Date:-2022-07-12 04:38:03


Question:
System analyst consist of following tasks:

1.Problem identification

2.Problem understanding

3.Analysis Problem

4.All of the above

Posted Date:-2022-07-12 04:28:44


Question:
System consists of----------------

1.Standards

2.Measurement

3.Compare

4.All of the above

Posted Date:-2022-07-12 03:38:42


Question:
The ------------ is produced at the culmination of the analysis task.

1.Software requirement specification

2.Questionnaires

3.Record Inspection

4.None of these

Posted Date:-2022-07-12 04:37:24


Question:
The objective of software engineering is to produce ----------

1.Software Product

2.Output

3.Input

4.Processing

Posted Date:-2022-07-12 04:39:33


Question:
The process of generating analysis and design documents is known as

1.Software engineering

2.Software re-engineering

3. Reverse engineering

4. Re-engineering

Posted Date:-2022-07-12 03:43:11


Question:
We can define information system as a set of devices, procedures, rules but most of the
work performs manually

1. Formal Information system

2.Manmade Information system

3.Informal information system

4.All of the above

Posted Date:-2022-07-12 03:40:13


Question:
What are the characteristics of software?

1. Software is developed or engineered; it is not manufactured in the classical sense.

2.Software doesn’t “ wear out ”. Software can be custom built or custom build.

3. C.

4.All of the mentioned

Posted Date:-2022-07-12 03:41:06


Question:
What are the four dimensions of Dependability?

1.Usability, Reliability, Security, Flexibility

2.Availability, Reliability, Maintainability, Security

3.Availability, Reliability, Security, Safety

4.Security, Safety, Testability, Usability

Posted Date:-2022-07-12 04:27:52


Question:
_____ expressly designed for the support of individual and collective decision making.

1.MIS

2.DSS

3.TPS

4.OIS

Posted Date:-2022-07-12 03:46:29


Question:
______ is an orderly grouping of independent components linked together
according to a plan to achieve a specific objective or goal.

1. System

2.Software

3.Subsystem

4.Physical system

Posted Date:-2022-07-12 03:37:17


More MCQS

  1. Software Engineering Introduction to System Concept
  2. Software Engineering Requirement Analysis
  3. Introduction to Software Engineering
  4. Analysis and Design Tools Mcq
  5. Software Development Methodologies
Search
R4R Team
R4Rin Top Tutorials are Core Java,Hibernate ,Spring,Sturts.The content on R4R.in website is done by expert team not only with the help of books but along with the strong professional knowledge in all context like coding,designing, marketing,etc!