The method in which roof arch is completed before excavating a trench for laying muck track is known as
The explosive recommended for blasting a soft rock
Which one of the following is not a permanent drainage work
The method employing steel lined plates and air compressors for driving them is known as
First tunnel built in the world was in Babylon, in the year
Mechanical ventilation method used in tunnels consists of
The drilling pattern in which 3 to 4 converging holes are so directed that they meet at point further is known as
Which one of the following is a method tunnelling in running ground?
Diverting water entering tunnel is
Which one of the following is a method of tunneling in firm soft strata?
Drift method of tunnelling is used to construct tunnel in
Which one of the following is a component of a shield for tunneling?
In Belgium method of tunneling
Circular section of tunnels is not suitable for
The explosive used in tunnelling is
For tunnels exceeding 300 m in length, the grade should be provided below
Which one of the following linings is suitable for shield driven tunnels particularly in the subaqueous regions
For highways, tunnelling is preferred to if the open cut exceeds
Which one of the following methods is generally adopted for tunneling in firm ground
An overhead track on a large truss frame is required in case of car changer by
Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?
Which of the following is not a component of the shield?
For mucking the method employed is
Which one of the following is not a drilling pattern adopted in tunnelling?
Which one of the following is not a method of supporting roof and sides in multiple drift method of tunnelling?
The tunnels, the artificial underground passages are constructed for
Which one of the following statements is not correct for heading and benching method of tunnelling?
To obtain the required shape of the tunnel section, we use
For B.G. single track, the section of the tunnel must have a width
Forepoling method is generally adopted for tunneling in
Which one of the following methods of tunneling is used for long tunnels at great depths?
The correct sequence of drilling equipment for increasing size of holes in tunnels is
Pack grouting with concrete is required between
The length of the first tunnel built in the world of Babylon in the year 2000 BC was
In tunnel, unless special provision is made for proper drainage, the gradient should not be more than
For full face method, the excavation to be done generally divided into
Concrete lining is provided concurrently with the driving operation in case of
Which one of the following methods is adopted permanent drainage of tunnels
For B.G. single track railway, the height of the tunnel above top of rails should be
If ‘N’ is the number of shafts used, then the total number of faces available for attacking the excavation and construction in tunnels are
The most suitable soil for compressed air tunneling is
A good blast with a good yield is obtained if the cut hole is
The method of lining in tunnel is
In case of tunnels in hilly areas to align tunnel ends use
Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than
A tunnel is found more advantageous as compared to the alternate routes because it
Railway tunnels, are generally
Which one of the following statements is not correct with regard to heading and hunching method of tunnelling.
The most commonly adopted pattern of cut holes is
In the wooden bulk head, used for mucking in steep grade tunnels.
Drift method of tunneling is used to construct tunnels in
Which of the following lining material is useful for shield driven tunnels in sub aqueous regions?
Drifters can be used to drill
In compressed air tunneling, the volume of free air provided is
Which one of the following tunneling methods is used for laying underground sewers?
Which one of the following methods of tunneling does not require the use of time bearing.
In case of drift method of tunnelling, the drift may be excavated at
The length of the needle beam used in needle beam method of tunneling is usually
Pick up the correct statement from the following during tunnel excavation
The method of draining in the tunnels, is generally known as