Name the graphical practice that depicts the meaningful changes that occurred in metrics data.
1.Function point analysis
2.Control Chart
3.DRE (Defect Removal Efficiency)
4.None of the above
RUP is abbreviated as __________, invented by a division of __________.
1.Rational Unified Process, IBM
2.Rational Unified Program, IBM
3.Rational Unified Process, Infosys
4.Rational Unified Program, Infosys
The project planner examines the statement of scope and extracts all-important software functions, which is known as
1.Planning process
2.Decomposition
3.Association
4.All of the mentioned
The RUP can be defined based on three main perspectives, i.e., static, dynamic & practice. What is the purpose of static perspective?
1.It recommends some good practices that be included while carrying out the process.
2.It displays all the enacted process activities.
3.It portrays the phases that the model has entered over a specific time.
4.All of the above.
The __________ and __________ are the two major dimensions encompassed in the Spiral model.
1.Diagonal, Perpendicular
2.Perpendicular, Radial
3.Angular, diagonal
4.Radial, Angular
What does RAD stand for?
1.Rapid Application Document
2.Rapid Application Development
3.Relative Application Development
4.None of the above
What is developed by utilizing the historical cost function?
1.Parkinson's Law
2.Expert judgment
3.Algorithmic cost modeling
4.Estimation by analogy
Which of the following activities is not applicable to agile software development?
1.Producing only the essential work products.
2.Utilizing the strategy of incremental product delivery.
3.Abolishing the project planning and testing.
4.All of the above
Which of the following is not included in the total effort cost?
1.Costs of lunch time food
2.Costs of support staff
3.Costs of networking and communications
4.Costs of air conditioning and lighting in the office space
Which of the following model has a misconception that systems are built by utilizing reusable components, scripts, and database programs?
1.The reuse model
2.An early designed model
3.An application-composition model
4.A post architecture model
Which of the following refers to internal software equality?
1.Scalability
2.Reusability
3.Reliability
4.Usability
An erroneous system state that results in an unexpected system behavior is acknowledged as?
1.System failure
2.Human error or mistake
3.System error
4.System fault
Model selection is based on __________.
1.Requirements
2.Development team & users
3.Project type & associated risk
4.All of the above
On what basis is plan-driven development different from that of the software development process?
1.Based on the iterations that occurred within the activities.
2.Based on the output, which is derived after negotiating in the software development process.
3.Based on the interleaved specification, design, testing, and implementation activities.
4.All of the above
The agile software development model is built based on __________.
1.Linear Development
2.Incremental Development
3.Iterative Development
4.Both Incremental and Iterative Development
The major drawback of RAD model is ________
1.It requires highly skilled developers/designers.
2.It necessitates customer feedbacks.
3.It increases the component reusability.
4.Both (a) & (c)
The __________ model helps in representing the system's dynamic behavior.
1.Object Model
2.Context Model
3.Behavioral Model
4.Data Model
What does a data store symbol in the Data Flow Diagram signify?
1.Logical File
2.Physical File
3.Data Structure
4.All of the above
What does a directed arc or line signify?
1.Data Flow
2.Data Process
3.Data Stores
4.None of the above
What does the study of an existing system refer to?
1.Details of DFD
2.Feasibility Study
3.System Analysis
4.System Planning
What is the first step in the software development lifecycle?
1. System Design
2.Coding
3. System Testing
4.Preliminary Investigation and Analysis
What is the main intent of project metrics?
1.For strategic purposes
2.To minimize the development schedule.
3.To evaluate the ongoing project's quality on a daily basis
4.To minimize the development schedule and evaluate the ongoing project's quality on a daily basis
What is the main task of project indicators?
1.To evaluate the ongoing project's status and track possible risks.
2.To evaluate the ongoing project's status.
3.To track potential risks.
4.None of the above
What is the major drawback of the Spiral Model?
1.Higher amount of risk analysis
2.Doesn't work well for smaller projects
3.Additional functionalities are added later on
4.Strong approval and documentation control
What is the name of the approach that follows step-by-step instructions for solving a problem?
1.An Algorithm
2.A Plan
3.A List
4.Sequential Structure
When the user participation isn't involved, which of the following models will not result in the desired output?
1.Prototyping & Waterfall
2.Prototyping & RAD
3.Prototyping & Spiral
4.RAD & Spiral
Which of the following activities of the generic process framework delivers a feedback report?
1.Deployment
2.Planning
3.Modeling
4.Construction
Which of the following does not complement the decomposition techniques but offers a potential estimation approach for their impersonal growth?
1.Empirical estimation models
2.Decomposition techniques
3.Automated estimation tools
4.Both empirical estimation models and automated estimation tools
Which of the following does not relate to Evolutionary Process Model?
1.Incremental Model
2.Concurrent Development Model
3.WINWIN Spiral Model
4.All of the above
Which of the following falls under the category of software products?
1.Firmware, CAD
2.Embedded, CAM
3.Customized, Generic
4.CAD, Embedded
Which of the following framework activities are carried out in Adaptive Software Development (ASD)?
1.Assumption, Association, Learning
2.The investigation, Strategy, Coding
3.Requirements gathering, Adaptive cycle planning, Iterative development
4.All of the above
Which of the following is an example of Black Box and Functional Processing?
1.First Generation Language
2.Second Generation Language
3.Third Generation Language
4.Fourth Generation Language
Which of the following is an incorrect activity for the configuration management of a software system?
1.Change management
2.System management
3.Internship management
4.Version management
Which of the following is involved in the system planning and designing phase of the Software Development Life Cycle (SDLC)?
1.Sizing
2.Parallel run
3.Specification freeze
4.All of the above
Which of the following Is not considered as an option for achieving reliable cost and effort estimation?
1.The ability to translate the size estimate into human effort, calendar time, and dollars
2.Use relatively simple decomposition techniques to generate project cost and effort estimates.
3.Base estimates on similar projects that have already been completed
4.Use one or more empirical models for software cost and effort estimation
Which of the following is the main advantage of deploying a 4GT model for producing small-scale products, programs, and applications?
1.The productivity of software engineers is improved.
2.The time required for developing software is reduced.
3.CASE tools and code generators help the 4GT model by providing a credible solution to their problems.
4.None of the above.
Which of the following methodology results in SA/SD features?
1.Gane and Sarson methodology
2.DeMarco and Yourdon methodology
3.Constantine and Yourdon methodology
4.All of the above
Which of the following model has a major downfall to a software development life cycle in terms of the coding phase?
1.4GT Model
2.Waterfall Model
3.RAD Model
4.Spiral Model
Which of the following model will be preferred by a company that is planning to deploy an advanced version of the existing software in the market?
1.Spiral
2.Iterative Enhancement
3.RAD
4.Both (b) and (c)
Which of the following models doesn't necessitate defining requirements at the earliest in the lifecycle?
1.RAD & Waterfall
2.Prototyping & Waterfall
3.Spiral & Prototyping
4.Spiral & RAD
Which of the following option is correct?
1.The prototyping model facilitates the reusability of components.
2.RAD Model facilitates reusability of components
3.Both RAD & Prototyping Model facilitates reusability of components
4.None
Which of the following prototypes does not associated with Prototyping Model?
1.Domain Prototype
2.Vertical Prototype
3.Horizontal Prototype
4.Diagonal Prototype
Which of the following technique is involved in certifying the sustained development of legacy systems?
1.Reengineering
2.Forward engineering
3.Reverse engineering
4.Reverse engineering and Reengineering
Which of the following word correctly summarized the importance of software design?
1.Quality
2.Complexity
3.Efficiency
4.Accuracy
Which one of the following activities is not recommended for software processes in software engineering?
1.Software Evolution
2.Software Verification
3.Software Testing & Validation
4.Software designing
Which parameters are essentially used while computing the software development cost?
1.Hardware and Software Costs
2.Effort Costs
3.Travel and Training Costs
4.All of the above
______ is not a direct measure of SE process.
1.Effort
2.Cost
3.Efficiency
4.All of the above
_______ is identified as fourth generation language.
1.Unix shell
2.C++
3.COBOL
4.FORTRAN
_______ is not considered as an activity of Structured Analysis (SA).
1.Transformation of a textual problem description into a graphic model
2.Functional decomposition
3.All the functions represented in the DFD are mapped to a module structure
4.All of the mentioned